Water Control

Pleasant Hill Bio Retention Cells

Pleasant Hill, CA
  •  
August 2018
Download .PDFDownload .PDF
Project For
Contractor
Mountain Cascade
Engineer
Carlson, Barbee and Gibson
Owner
TRI Pointe Homes
Max Depth
4 ft (1.2 m)
Max Retained Height
Length

Features

Shipping Details

Background

TRI Pointe Homes made plans to develop 44 multifamily homes on 3.3 acres in Pleasant Hill, CA. They were required to have 5,000 square feet of bio retention treatment area.

Why CMI

ShoreGuard vinyl Flat Panels were chosen as the solution instead of concrete. Our vinyl proved to be more cost effective, non-corrosive, easier to transport and install.

Installation

Mountain Cascade’s crew installed 15 ft x 15 ft bio retention cells using 4 ft pieces of Flat Panel™ FP-475. Installation time took about an hour to complete per cell.